Extent of a periodic inspection (PIR)
When
entering into an agreement for electrical inspection and testing of a
building under your control it is a fundamental requirement that the
extent and limitations of the inspection and testing are fully
described. It is recommended that the following be agreed prior to
beginning the work, and we can assist you in determining your exact
requirements for inspection and testing.
As
it is neither practical nor possible to inspect all parts of an
installation, we will agree a sampling process. This is normally in
the order of 10%-20% of all accessories, fittings and control equipment.
For much of the testing the electrical system will be switched off.
If this is a problem we can arrange the work at times when this is more
convenient.
We will agree before
commencing the work the amount of down time that can be tolerated and
arrange a provisional program for switching off – totally, and individual
areas or distribution boards if required.
Cost of the Work
This will be largely based around the extent of the work as described
above, and as such we cannot quote fixed prices for such variable
possibilities. But to give you some idea of costs we would aim to
complete a full Periodic Inspection, Test, and Certification of an
average domestic dwelling house as follows.
|
Periodic Electrical Inspection BS7671
Domestic premises:
Additional circuits
|
£115 for up to 6 circuits
£15 per circuit
|
|
Electrical Periodic Inspection Certificates
On
completion of the Inspection and Test report will be provided,
detailing the condition of the installation, results of all tests carried
out, a list of any faults, and recommendations and a conclusion as to
relative safety of the installation.
Frequency
In conjunction with
requirements from the Institute of Electrical Engineers (IEE) and Local
Authorities, A1 PAT Testing Services recommend the following inspection
and testing timescale for let properties:
|
Inspection
|
Flats and Houses
|
HMOs and Bed sits
|
|
Routine
Inspection
|
Annually
|
Annually
|
|
Periodic Inspection
|
Every
5 Years
|
Every
3 Years
|
|